Old Dryer Out, New Dryer In

Home 9 News 9 Old Dryer Out, New Dryer In

NEWS

Old Dryer Out, New Dryer In

The long weekend gave us the chance to carry out planned maintenance at an asphalt plant in Ipswich. The job was to remove the old dryer and install a new one.

It was a big task, but the Bulldog team handled it the way we always do – planned carefully, carried out safely, and finished on time.

Bulldog has been working on plants and equipment for many years, and our crew bring plenty of practical know-how to every site. Having the right skills, the right kit, and a team that works well together makes all the difference on jobs like this.

Another dryer changed, another plant ready to keep running strong.

Contact us today:

Tel: 0 1371 873 282

Email: info@bulldogplant.com

LATEST NEWS

Steel Fabrication — Built by Bulldog

Steel Fabrication — Built by Bulldog

Steel fabrication is not a side service for us — it is at the heart of what we do. Every bespoke bracket, platform, chute, support frame or weigh hopper we supply is measured, cut, welded and finished in-house by our own engineers. No guesswork. No outsourcing. No...

read more
No Height is Too High

No Height is Too High

Replacing a vibrating screen for one of our customers was not an easy task. The location of the screen made lifting difficult and required careful planning and teamwork. Our maintenance, installation and relocation team handled the job with precision and focus,...

read more
Another concrete plant has been moved from HS2 South Portal

Another concrete plant has been moved from HS2 South Portal

Our team has recently completed the dismantling and tranporting of a concrete batching plant that had been serving the HS2 project. A key part of the work was the relocation of the main batch conveyor. Instead of dismantling it into sections, our team planned and...

read more

Bulldog are here to help

The Bulldog team are on-hand to help find the right solution for your project.
Please call us on 01371 873282 or send us your enquiry.