Old Dryer Out, New Dryer In

Home 9 News 9 Old Dryer Out, New Dryer In

NEWS

Old Dryer Out, New Dryer In

The long weekend gave us the chance to carry out planned maintenance at an asphalt plant in Ipswich. The job was to remove the old dryer and install a new one.

It was a big task, but the Bulldog team handled it the way we always do – planned carefully, carried out safely, and finished on time.

Bulldog has been working on plants and equipment for many years, and our crew bring plenty of practical know-how to every site. Having the right skills, the right kit, and a team that works well together makes all the difference on jobs like this.

Another dryer changed, another plant ready to keep running strong.

Contact us today:

Tel: 0 1371 873 282

Email: info@bulldogplant.com

LATEST NEWS

Bitumen Loadout System Installation

Bitumen Loadout System Installation

We recently completed the installation of a new bitumen loadout system for one of our customers. This was a good example of the kind of work our team handles well: planned properly, carried out safely, and completed without unnecessary delay. At Bulldog, we’re used to...

read more
Meet Bulldog at Hillhead 2026

Meet Bulldog at Hillhead 2026

We’ll be at Hillhead 2026, 23–25 June at Hillhead Quarry, Buxton. Hillhead is always a good opportunity to catch up, talk through live projects, and look at what is coming next in the quarrying, construction and recycling industries. If you don’t know us yet, Bulldog...

read more
Steel Fabrication — Built by Bulldog

Steel Fabrication — Built by Bulldog

Steel fabrication is not a side service for us — it is at the heart of what we do. Every bespoke bracket, platform, chute, support frame or weigh hopper we supply is measured, cut, welded and finished in-house by our own engineers. No guesswork. No outsourcing. No...

read more

Bulldog are here to help

The Bulldog team are on-hand to help find the right solution for your project.
Please call us on 01371 873282 or send us your enquiry.