First Batch & First Snow: The Bulldog 125 Takes Centre Stage!

Home 9 News 9 First Batch & First Snow: The Bulldog 125 Takes Centre Stage!

NEWS

First Batch & First Snow: The Bulldog 125 Takes Centre Stage!

As the first snow fell, the first batch rolled out of our newly commissioned Bulldog 125 Free-Standing Modular Asphalt Plant. Built for efficiency, reliability, and sustainability, this plant is ready to mix asphalt whatever the weather – come rain, shine, or snow.

Asphalt Plant but Made Smarter!

  • Robust 1750 kg Mixer: Producing up to 125 tonnes/hour, this mixer is built to handle demanding projects with ease.
  • Energy-Saving Horizontal Skip System: The horizontal skip travels a shorter distance, reducing heat loss during material transfer maintaining asphalt quality.
  • Compact, Modular Design: With a free-standing structure and mobile foundations, this plant reduces groundwork requirements and installation time.
  • Vertical Hot Storage: Hot storage bins positioned under the mixer save space and improve efficiency without compromising capacity.
  • Utilising Existing Equipment: We integrated the customer’s cold bins with new feeding conveyors, delivering both sustainability and cost-effectiveness.

Built for Sustainability

With eco-friendly features that minimise emissions and energy consumption, the Bulldog 125 supports greener construction practices without sacrificing performance.

Snow? No Problem.

While snowflakes were settling outside, our team was busy making sure the first batch was a hit. Shout out to our hard-working crew and subcontractors for quick completion. You are all true professionals, like always!

Need help setting up a new plant or refurbishing your old one? Let’s make your asphalt dreams come true – no matter the forecast!

Contact Us:
Tel: 0 1371 873282
Email: info@bulldogplant.com

LATEST NEWS

Bitumen Loadout System Installation

Bitumen Loadout System Installation

We recently completed the installation of a new bitumen loadout system for one of our customers. This was a good example of the kind of work our team handles well: planned properly, carried out safely, and completed without unnecessary delay. At Bulldog, we’re used to...

read more
Meet Bulldog at Hillhead 2026

Meet Bulldog at Hillhead 2026

We’ll be at Hillhead 2026, 23–25 June at Hillhead Quarry, Buxton. Hillhead is always a good opportunity to catch up, talk through live projects, and look at what is coming next in the quarrying, construction and recycling industries. If you don’t know us yet, Bulldog...

read more
Steel Fabrication — Built by Bulldog

Steel Fabrication — Built by Bulldog

Steel fabrication is not a side service for us — it is at the heart of what we do. Every bespoke bracket, platform, chute, support frame or weigh hopper we supply is measured, cut, welded and finished in-house by our own engineers. No guesswork. No outsourcing. No...

read more

Bulldog are here to help

The Bulldog team are on-hand to help find the right solution for your project.
Please call us on 01371 873282 or send us your enquiry.