Another concrete plant has been moved from HS2 South Portal

Home 9 News 9 Another concrete plant has been moved from HS2 South Portal

NEWS

Another concrete plant has been moved from HS2 South Portal

Our team has recently completed the dismantling and tranporting of a concrete batching plant that had been serving the HS2 project. A key part of the work was the relocation of the main batch conveyor. Instead of dismantling it into sections, our team planned and executed the transport of the conveyor in one complete piece. This approach saved our customer valuable time on site and thousands of pounds in costs, while ensuring the conveyor was ready for rapid reinstallation.

The move required careful planning, specialist lifting, and the use of a dedicated vehicle arranged specifically for the job. Our experienced team managed the process end to end, demonstrating the difference that true industry expertise makes.

Any plant supplied by Bulldog Plant & Equipment Ltd – whether concrete, asphalt or aggregate processing – is fully backed with spare parts, ongoing maintenance, and full relocation support. This commitment ensures our customers achieve the lowest maintenance costs and maximum uptime.

With Bulldog, you get proven experience, practical solutions, and a team that stands apart from the competition.

Contact us today for your plant needs.

Tel: 0 1371 873282

Email: info@bulldogplant.com

LATEST NEWS

Old Dryer Out, New Dryer In

Old Dryer Out, New Dryer In

The long weekend gave us the chance to carry out planned maintenance at an asphalt plant in Ipswich. The job was to remove the old dryer and install a new one. It was a big task, but the Bulldog team handled it the way we always do – planned carefully, carried out...

read more
Backed by Industry Accreditation

Backed by Industry Accreditation

Built on Safety: Our Commitment Backed by Industry Accreditation Safety is at the core of everything we do, it has always been. From our workshop to on-site installations, we follow strict safety protocols to ensure a safe environment for our team and partners. There...

read more
Extending the Life of Your Plants

Extending the Life of Your Plants

Older equipment doesn't always need to be completely replaced. With the right approach to maintenance, repairs, or upgrades, its lifespan can be significantly extended, resulting in valuable savings and keeping the plant operational for longer. We recently did some...

read more

Bulldog are here to help

The Bulldog team are on-hand to help find the right solution for your project.
Please call us on 01371 873282 or send us your enquiry.